The answer nobody wants
The honest answer is: read your compliance schedule.
That sounds like a dodge. It is not. Emergency lighting is unlike test and tag in a way that matters enormously here. With portable appliances, you choose your interval and justify it. With emergency lighting, the interval was decided for your specific building when it was consented, written into a document by the council, and it is legally binding.
There is no generic New Zealand frequency for emergency lighting. There is a frequency for your building, and it is on a document you may never have read.
If you do not have your compliance schedule, request a copy from your territorial authority. It is free, it takes an email, and it is the most useful half hour a new building owner or property manager will spend. Everything else on this page is context for reading it.
The typical New Zealand pattern
That said, most modern compliance schedules for Specified System 4 follow a recognisable shape. A representative council template sets it out as:
| Frequency | Who | What |
|---|---|---|
| Monthly | Owner or their agent | Visual check |
| Six-monthly | Independent Qualified Person | Inspection and testing |
| Annually | Independent Qualified Person | Inspection, testing and Form 12A certification |
Some councils' templates specify only an annual IQP attendance for standard installations. Others require six-monthly. Buildings on a specifically designed alternative solution can have something different again.
The inspection and maintenance standard named will usually be AS/NZS 2293.2:2019, Section 3 for anything reasonably modern. Older buildings may sit on AS/NZS 2293.2:1995 or NZS 6104:1981, and their procedures will read quite differently. That is not a defect. It is the schedule reflecting the standard the building was signed off against.
AS/NZS 2293.2 is a copyrighted document sold by Standards New Zealand. This page describes the framework and points you to your own compliance schedule; it does not reproduce the standard. If you are running this in-house, buy the edition your schedule names.
Who is allowed to do which test
This trips up more buildings than the frequencies do.
The monthly check is normally the owner's responsibility, carried out by the owner or their agent — a caretaker, a facilities person, a property manager. It does not require an IQP.
But there is a condition that most owners have never read. Compliance schedules commonly state that the IQP is responsible for ensuring proper training is delivered, and that only people who have received that training may perform owner inspections.
That sentence has teeth. If your caretaker has been ticking a logbook for three years and nobody ever trained them, you have a defensible-looking record built on an undocumented assumption. Ask your IQP to train whoever does the monthly checks, and record that the training happened.
The IQP inspections must be carried out by a person or firm approved by the territorial authority for that specified system. "Independent" means they have no financial interest in the building. Only an IQP can issue the Form 12A that your Building Warrant of Fitness depends on. There is more detail in what an IQP is and whether you need one.
Why councils differ
Building owners with property in more than one district notice this quickly and find it maddening.
The Building Act sets the framework: buildings with specified systems need a compliance schedule, the schedule sets inspection, maintenance and reporting procedures, and an annual BWoF is supplied to the territorial authority. But the schedule itself is issued by the local council, drawing on the relevant standard and MBIE's guidance, and councils use their own templates.
So two comparable buildings in two districts can end up with genuinely different wording, different IQP attendance frequencies, and different retention requirements. Both are valid.
The practical consequence for a portfolio: you cannot run one maintenance calendar across all your buildings from memory. Each building's schedule needs reading, and the calendar needs building from the schedules rather than from a house rule.
What the monthly check should actually cover
A monthly check that consists of walking past and looking up is not a check. What it should cover:
- Every fitting and exit sign accounted for against the plan. Fittings get removed during fitouts and nobody tells anyone.
- Each fitting operates on battery. Where the building has a test switch, use it. Where it does not, each fitting is checked individually.
- Exit signs are lit and, critically, visible. New partitions, shelving, stock and signage obscure exit signs constantly. An exit sign nobody can see has failed even though it works.
- No fitting is isolated or disconnected. After other electrical work, this happens more than you would think.
- Physical condition — damage, water ingress, diffusers missing, fittings hanging.
- Results recorded per fitting, dated and signed, in the logbook that lives on site with the compliance schedule.
That last point is the one that separates buildings that pass from buildings that do not. An undocumented test did not happen as far as your BWoF is concerned, and the records are commonly required to be retained for the previous 24 months and kept with the schedule.
Building a schedule that does not slip
The failure mode is almost never a broken light. It is January.
Monthly checks slip over the Christmas period, when the person who does them is away and the person covering does not know it is a task. They slip again when that person leaves. By the time the IQP arrives for the annual inspection, there are two or three gaps in the logbook and the Form 12A cannot be issued.
What works:
- Name a person, not a department. "Facilities" does not do monthly checks. A person does.
- Put it in a calendar with a reminder, on the same day each month, with a named backup for leave.
- Keep the logbook physically with the compliance schedule, on site. Not in someone's office, not in a shared drive nobody can find.
- Diarise the IQP visits a year ahead, and book them rather than waiting to be called.
- Reconcile the fitting count after every fitout. If the building changed, the schedule may need an amendment.
- Review the logbook quarterly, not annually. Finding a gap in month three is a nuisance. Finding it in month twelve is a failed BWoF.
If a check has already been missed, do not paper over it. There is a defined process, and using it is far better than the alternative — see missing a BWoF inspection.
Related: how long emergency lighting must stay on and emergency lighting and your Building Warrant of Fitness.